PT. WnD LNG ENERGY INDONESIA

PT. WnD INDONESIA HEAVY INDUSTRY

One-stop Solution for Gas

The purpose of developing the UTS was to reduce investments costs, provide flexibility, and enable LNG infrastructure being built efficiently and affordable. The UTS is typically built and assembled at a shipyard and shipped to site pre-commissioned for installation. The UTS platform can be built at any yard in the world as long as it delivers quality to meet Client, Connect LNG, and Class requirements as applicable.

Jetty Less FTS - UTS Solution